Re: Nine-month suspension coming to three light rail stops in JC

Posted by Bike_Lane on 2019/2/8 15:10:38
Quote:

hero69 wrote:
i understand the need to fix the pipe, but really a complete shutdown. what about reduced service? closure at night and/or just one track open.


They need to rip up the tracks, remove the overhead wires, and bring in equipment to dig down to the pipe. You can't run "reduced service" when the infrastructure itself is gone.

This Post was from: http://jclist.com/modules/newbb/viewtopic.php?post_id=435925