Re: PATH Trains Increase

Posted by Bike_Lane on 2018/6/28 13:08:15
The last round of cars worked out to, what, about $1.5M per car?
That was a decade ago. Since then, inflation, tariffs on many of the materials, and all of the gadgetry that make the cars operable with trackside PTC equipment have contributed to an increase in cost. Does all of that justify $1.3M increase in cost per car? Don't know.

This Post was from: http://jclist.com/modules/newbb/viewtopic.php?post_id=432755