Re: PATH (pathetic attempt at transporting humans)

Posted by hero69 on 2018/1/11 0:18:23
i wish PATH had countdown clocks at the entrances to the stations so people know when trains are coming and i replace the elevators and grove street escalator with something that does not break down. why are the nyc subway and nj transit light rail so much more reliable? why not not fully enclose the main entrance to the grove street PATH so that the escalator is not exposed to the elements.

it is ridiculous that the elderly/handicapped and pregnant women/women with baby strollers have to climb those stairs.

This Post was from: http://jclist.com/modules/newbb/viewtopic.php?post_id=428593